All Projects
Installation
Bay Area Transit Substation Upgrade
Sacramento, CA

Project Overview
Infrastructure improvement project introducing public-transit-grade modular escalators built to withstand heavy foot traffic and damp coastal weather elements.
Equipment & Materials
Heavy-duty commercial escalators, weatherized outdoor drive steps, oil-free drive chains, and smart variable-frequency drives (VFD).
Before & After
Before



After



Scope of Work
Handled structural crane coordination to drop modular truss segments into the underground terminal access point.
Secured high-strength anchoring plates directly into the transit station's foundational load walls.
Mounted weatherized mechanical step chains and automated smart-sensors that slow the system down when no passengers are detected.
Validated public safety parameters by running continuous 72-hour operational load testing blocks.

TRUSTED INDUSTRY PARTNERS





EMERGENCY LINE